MEZ Technologies

Right-sized server infrastructure for your AI and business applications

Most AI projects start with a hardware question: which GPU, how much memory, how many servers? Too small and the system is slow; too big and the budget is wasted. We measure your workload, choose the right hardware, install the servers and hand them over ready to use, with monitoring and backups in place.

When it's the right fit

You know which model you'll run and for how many users, but not how much GPU memory that takes.

The monthly cost of rented cloud GPUs has reached the point where buying looks worth considering.

Your servers are ageing, and this time you want the replacement to account for AI workloads too.

A GPU server you bought sits underused, or nobody knows how to monitor it.

What we do

Workload analysis and sizing

We look at which models and applications will run, how many people will use them at once and how you expect to grow, then work out the GPUs, memory and storage you need.

Hardware selection and sourcing

We compare quotes from different suppliers against the same technical criteria and spell out power, cooling and rack requirements in advance.

GPU server setup

We install the operating system, GPU drivers, CUDA and the container environment, and get the model server ready to use.

Virtualization and resource sharing

We set up virtualization and container-based resource sharing so several teams or applications can use the same hardware efficiently.

Monitoring and capacity tracking

We set up dashboards and alerts for GPU usage, temperature, memory and disk health, so capacity planning is based on measurements rather than guesses.

Backup and security

We harden the servers and design tested backups for model files, configurations and data.

What we weigh in hardware decisions

Server infrastructure is an investment you'll live with for years. We base decisions on today's needs plus reasonable room to grow.

  1. 01

    Measure first

    Where possible, we run the real workload on your current hardware or a short-term rented server and base the hardware decision on what we measure.

  2. 02

    GPU memory is decisive

    With language models, the GPU memory the model has to fit into often matters more than raw compute. We choose based on model size and the number of concurrent users.

  3. 03

    Cloud versus your own servers

    Steady, predictable workloads are often cheaper on your own servers, while fluctuating ones can benefit from the cloud's flexibility. We run the comparison with your own usage figures.

  4. 04

    The physical environment

    GPU servers draw a lot of power and produce serious heat. We check that power, cooling and rack space are adequate before installation.

How the project runs

  1. 1

    Requirements

    We review the workloads, user numbers and physical environment, and put the requirements in writing.

  2. 2

    Hardware proposal

    We prepare a sized hardware proposal and cost comparison, and help with sourcing.

  3. 3

    Setup and testing

    We install the servers, prepare the software layers and test performance with the real workload.

  4. 4

    Monitoring and maintenance

    If you'd like, we monitor the system and handle updates and backup checks on a regular basis.

Example use cases

A first AI server

Challenge
The company is buying its first GPU server for an in-house document assistant and wants enough capacity without overspending.
Approach
Requirements are calculated from the model and user count, and the chosen server is installed and tested under real workloads.
Expected outcome
The company doesn't overbuy, and capacity is added when measurements show it's needed.

Moving from cloud to own servers

Challenge
The bill for cloud GPUs rented for model training and testing grows every month.
Approach
Usage data is reviewed; always-on workloads move to an owned server, and the cloud is kept as overflow capacity for spikes.
Expected outcome
Steady workloads get a predictable cost, and the cloud is still there when flexibility is needed.

Frequently asked questions

Can consumer-grade GPUs be used?

For small teams and pilots they're often sufficient and economical. For sustained heavy use, many concurrent users or large models, data-center GPUs may be a better fit. We choose together based on how you'll use them.

Can we add a GPU to our existing server?

Sometimes, yes. If the server's power supply, cooling, physical space and expansion slots can handle a GPU, adding a card to an existing server can be an economical option. We check suitability by inspecting your server on site.

Should the server live in our office or a data center?

If your office has enough power, cooling and physical security, hosting the server on site is possible. If not, a data center is the safer option. We look at your environment and make a recommendation.

Can several teams share one GPU server?

Yes. With virtualization or container-based resource sharing, the same hardware can be shared across teams and applications. Usage per team can be tracked and capped when needed.

Let's work out your hardware needs

Tell us which applications you want to run and for how many users, and we'll size the right server infrastructure.

Book a call